FPC

From Opera Wiki

Jump to: navigation, search

The purpose of this manual is to guide the user in entering within Opera Job Management the data needed to compile the factory production control plan (hereafter referred to as FPC necessary to be able to perform CE marking.

Contents


Note N.B: For more information on CE marking, please refer to this link [1] or the study of UNI EN 14351-1, UNI EN 13569, UNI EN 13651 and UNI EN ISO 9001
Note N.B: Following the installation of the new CE KIT, you will find in C:\Opera\ce two informative pdfs: media:Guide_Normative_CE.pdf and media:Manual_Operational_CE.pdf



FPC

The FPC is the document that describes one's company's production process; accompanied by the initial type tests (called ITT) it enables window and door manufacturers to CE mark their products.

Our CVT consists of a main document plus several annexes. Below is the complete list of documents:

  1. FPC – Production control plan (main document)
  2. Allegato 1 – Documentation list
  3. Allegato 2 – Appointment of CVT Manager
  4. Allegato 3 – Table operators
  5. Allegato 4 – Machinery/equipment table
  6. Allegato 5 – Machinery maintenance log
  7. Allegato 6 – Measuring instruments table
  8. Allegato 7 – Tableau ITT
  9. Allegato 8 – Non-compliance log
  10. Allegato 9 – Supplier list
  11. Allegato 10 – CVT module list
  12. Allegato 11 – List of normative references