The purpose of this manual is to guide the user in entering within Opera Job Management the data needed to compile the factory production control plan (hereafter referred to as FPC necessary to be able to perform CE marking.
Contents |


FPC
The FPC is the document that describes one's company's production process; accompanied by the initial type tests (called ITT) it enables window and door manufacturers to CE mark their products.
Our CVT consists of a main document plus several annexes. Below is the complete list of documents:
- FPC – Production control plan (main document)
- Allegato 1 – Documentation list
- Allegato 2 – Appointment of CVT Manager
- Allegato 3 – Table operators
- Allegato 4 – Machinery/equipment table
- Allegato 5 – Machinery maintenance log
- Allegato 6 – Measuring instruments table
- Allegato 7 – Tableau ITT
- Allegato 8 – Non-compliance log
- Allegato 9 – Supplier list
- Allegato 10 – CVT module list
- Allegato 11 – List of normative references