Job Parts List
From Opera Wiki
(Difference between revisions)
(→Right sidebar) |
(→Actions section) |
||
Line 50: | Line 50: | ||
* [[File:tastostandard.png]]: recalculates the parts list. | * [[File:tastostandard.png]]: recalculates the parts list. | ||
* [[File:tastodistinta.png]]: prints out the materials order to the supplier. The program will open [[Parts list printout|parts list printout]] where all the required material for the work order will be displayed; it will be possible to make changes before printing the order. | * [[File:tastodistinta.png]]: prints out the materials order to the supplier. The program will open [[Parts list printout|parts list printout]] where all the required material for the work order will be displayed; it will be possible to make changes before printing the order. | ||
- | * [[File:tastobarre.png]]: | + | * [[File:tastobarre.png]]: the status of this button affects how the program will calculate the cost of the profiles. |
- | : | + | :*if disabled (default), the cost of the profiles will be given by the cost of the required quantity for the job plus a wastage amount. |
- | + | :{{NOTE|Therefore, the customer will have to pay for the pieces used to make the work order plus the yearly waste percentage output in the company data.}} | |
- | + | ||
- | * [[File:tastosconti.png]]: | + | |
+ | :*If enabled, the cost of the profiles will be the total cost of the bars necessary to carry out the work order. | ||
+ | :{{NOTE|Therefore, the client will have to pay for the pieces used to make the work order plus the entire remaining, including everything that is wasted during processing.}} | ||
+ | |||
+ | * [[File:tastosconti.png]]: ehen this button is pushed, discounts included when the prices were entered in the relevant files can be calculated and applied. | ||
+ | |||
+ | |||
<!-- | <!-- |
Revision as of 15:06, 10 June 2011
In questo riquadro saranno elencati tutti i materiali appartenenti alle tipologie della commessa scelta, con i relativi pesi, prezzi, situazione di magazzino, ecc…
La sua funzione è principalmente quella di consultazione, per verificare ad esempio le quantità dei materiali, o la correttezza dei codici o dei prezzi; non è da considerarsi quindi come un quadro di inserimento o manipolazione dei materiali della commessa, che è invece prerogativa del Foglio di progettazione.
Di seguito la descrizione dei contenuti del quadro:
Contents |
Right sidebar
- NOTE:
this field is active only with a Profile type
- Supplier: the material supplier name.
- Unit of measure : the measurement unit to be assigned to the item.
- Size: the material quantity according to the measurement unit.
- Qty.: the number of article items.
- Exclude from printed list: if activated, the program will not show this item on the supplier’s order form.
N.B: An M letter will be displayed next to every manually added item of the material list
- : deletes the selected material from the work order.
- : used to replace the material with a different one.
- : duplicates a material from the list.
- : prints out the parts list.
- : copies the entire parts list to the clipboard.
- : allows the user to choose if the parts list have to include only the actually used part or the entire packages.
- NOTE:
this option is only available if the field Pack quantity has been previously set in Accessories
Actions section
- : recalculates the parts list.
- : prints out the materials order to the supplier. The program will open parts list printout where all the required material for the work order will be displayed; it will be possible to make changes before printing the order.
- : the status of this button affects how the program will calculate the cost of the profiles.
- if disabled (default), the cost of the profiles will be given by the cost of the required quantity for the job plus a wastage amount.
- NOTE:
Therefore, the customer will have to pay for the pieces used to make the work order plus the yearly waste percentage output in the company data.
- If enabled, the cost of the profiles will be the total cost of the bars necessary to carry out the work order.
- NOTE:
Therefore, the client will have to pay for the pieces used to make the work order plus the entire remaining, including everything that is wasted during processing.