forum456 First Class Elite. LNG to FSRU conversion. Keppel Offshore & Marine Ltd (Keppel O&M), through its subsidiary, Keppel FELS Brasil SA's BrasFELS shipyard has been awarded a Floating Production Storage and Offloading (FPSO… Petrobras (PBR) Places $2.3B FPSO Order to Keppel Shipyard Nasdaq 10:29 13-May-21 Shearwater GeoServices awarded Campos Basin 3D and 4D programmes by Petrobras Oilfield Technology 05:17 13-May-21 PetroBras mothballing 120-MW gas-fired plant in Brazil Power Engineering 15:03 12-May-21 Keppel Offshore & Marine awarded US$2.3b contract to build FPSO for Petrobras Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). Keppel Offshore & Marine's (Keppel O&M) wholly owned subsidiary Keppel FELS Brasil's BrasFELS shipyard in Brazil has delivered the Cidade de Campos dos Goytacazes MV29, a Floating Production Storage and Offloading (FPSO) vessel, to repeat customer MODEC Offshore Production Systems (Singapore) Pte. The vessel, which should be delivered in 2024 and pump first oil in 2025, will also have installed capacity to produce 180,000 b/d and process up to 7.2 million cu m/d. [Read more…] about McDermott to name new derrick lay vessel in April. FPSO Berantai– Keppel Shipyard and Petrofac completed their first conversion project. The converted vessel, which includes a disconnectable turret mooring system, was christened at Singapore’s Keppel shipyard on Apr. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and … Like the FPSO. The vessel, which should be delivered in 2024 and pump first oil in 2025, will also have installed capacity to produce 180,000 b/d and process up to 7.2 million cu m/d. The vessel, scheduled for delivery in 2Q 2021, the FPSO will be able to process 90,000 b/d of oil and 75 MMcf/d of gas, with a storage capacity for 700,000 bbl of oil. Keppel Offshore & Marine (Keppel O&M)’s wholly-owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). The FPSO will be deployed at the Sepia field, which is located in the pre-salt region in the Santos Basin, some 250 kilometers off the coast of Rio de Janeiro, Brazil. Three Korean shipyards submitted proposals and participated in the tender. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). Named P-80, the platform will be the ninth unit to operate in the field, with the capacity to process 225 000 bpd of oil and 12 million m 3 /d of gas. Petrobras previously signed a deal to build the FPSO P-78 with Keppel Shipyard on May 10. In Brazil, Keppel O&M’s BrasFELS shipyard has been awarded a topside module fabrication contract for an FPSO for the Buzios field in the Santos Basin, off the coast of Rio de Janeiro, Brazil. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel … FPSO P53 - This conversion for Petrobras included the installation of a marine system as well as the fabrication and integration of an internal turret with 75 risers. FPSO Polvo - Capable of handling a daily oil production of 90,000 bopd, this is the seventh FPSO converted by Keppel Shipyard for Prosafe. Keppel/Hyundai Shipyard Ahead to Build Petrobras Own Floater for Buzios. 1. Scheduled for completion in late 2024, the FPSO will be customised for deployment in Brazil’s prolific Buzios field, … Find more similar flip PDFs like CONFIGURED FOR GROWTH - Keppel Offshore & Marine. It has been chartered by OGX Petroleo e Gas Participacoes S.A. for operations in offshore Brazil. 1. Business Update . Keppel Shipyard to build seventh Búzios FPSO, Kosmos drilling offshore Ghana, Equatorial Guinea, North Sea Greater Buchan Area project moving closer to FEED. Report: Keppel Submits Lowest Bid to Build FPSO for Petrobras' Buzios Field Feb 04, 2021 A consortium led by Singapore-based Keppel Shipyard Limited offered Brazil's Petrobras the lowest price to build a floating platform for Buzios, Latin America's second-largest oil field, three people close to the competition said.Keppel offered to build P-78… Advertisement. Invitations to tender for the Espadarte FPSO were first issued in November 1997. ... Petrobras has opened the bidding process for a new FPSO for the giant Búzios field in the presalt Santos basin. In parallel, Petrobras is preparing the call for tender (CFT) for the tow following FPSOs, the so called, P-76 and P-77. We harness the synergy of 20 yards worldwide to be near our customers and their markets. One of these projects involves the major conversion of P-53 project for Petrobras. OWNER. SINGAPORE (THE BUSINESS TIMES) - Keppel Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. The development lays at a water depth of 160 meters and consists of approximately 100 mm bbl of reserves and will be produced through subsea wells tied back to an FPSO. 3-2-2021 11:11 PM . Keppel and Hyundai to build world’s largest FPSO for Petrobras. Ltd. Aug. 2010 – Dec. 2010 Permit to Work Coordinator. FPSO 2015 PSR-final. Leading Latin American towage firm orders two ASD Tugs 2411. Petrobras (PBR) Places $2.3B FPSO Order to Keppel Shipyard Petrobras (PBR) awards a contract to Keppel Shipyard to build an FPSO vessel, which will have a distillation capacity of 180 thousand barrels of oil and 7.2 million cubic meters of gas per day. Duraplate 301 Onshore/Offshore Track Record. Keppel Shipyard is presently converting another major project, FPSO Okha, for SBM at its Tuas yard. Austal Australia has launched a 70-metre offshore crew transfer vessel being built for Caspian Marine Services (CMS) of Azerbaijan, at the company’s Henderson shipyard .. … Year 1998 - Dry Dock • 19150DWT Multi Bulk Carrier • Self-Erecting Tender Barge • Anchor Handling Tug • Passenger Vessel • FPSO • FPSO (P37) SHIPYARD. Posts: 6,504 Joined: 10 2014 Reputation: 19 #1. Keppel Shipyard leading Petrobras FPSO tender. Brazil’s Petrobras announced that, on February 25, 2012, production started at Cascade Field, U.S. Gulf of Mexico.The Cascade 4 well is connected to the FPSO BW Pioneer, located approximately 250 kilometers of coast of Louisiana in water depth of 2500 meters.. EOC said the FPSO … Keppel Shipyard is a wholly owned subsidiary of Keppel Corporation, through Keppel O&M, a leader in offshore rigs, ship repair and conversion and specialised shipbuilding. Petrobras moves on Tupi and Franco FPSOs Topsides Petrobras is ready to open publicly the bids submitted for the topsides packages of the floating production, storage and offloading (FPSO) vessels called P-74 and P-75. The Keppel / Hyundai consortium presented the lowest price in Petrobras’ bid for the construction of the P-78, the oil company’s own FPSO that will be used in the Búzios project. Petrobras opened today the envelopes with the proposals to build their own P-78 and P-79 FPSOs. Keppel Shipyard leading Petrobras FPSO tender . It supports all the well drilling and workover activities, as well as exports the production to the P-63 FPSO. Petrobras (PBR) awards a contract to Keppel Shipyard to build an FPSO vessel, which will have a distillation capacity of 180 thousand barrels of oil and 7.2 million cubic meters of gas per day. SINGAPORE (THE BUSINESS TIMES) - Keppel Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. KEPPEL Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel … In August 2020, Petrobras signed a Letter of Intent (LOI) with Malaysia’s MISC Berhad for the chartering and provision of the FPSO. Helps you prepare job interviews and practice interview skills and techniques. Keppel O&M recently announced it. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). The contract was awarded by Brazil's national oil company, Petroleo Brasileiro SA (Petrobras) on the basis of an international tender for the delivery of P-78, a floating production storage and offloading vessel (FPSO). The maritime industry’s leading source for breaking maritime and marine news including shipping news, offshore news, piracy news and more Media & Analysts Conference Call Transcript. Chief executive officer of Keppel O&M Chris Ong said that the company is pleased to support Petrobras with another major FPSO. The Keppel / Hyundai consortium presented the lowest price in Petrobras’ bid for the construction of the P-78, the oil company’s own FPSO that will be used in the Búzios project. Three Korean shipyards submitted proposals and participated in the tender. SINGAPORE – Keppel Offshore & Marine (Keppel O&M) has through its wholly-owned subsidiaries in Singapore and Brazil secured two contracts from MODEC for FPSOs with a combined value of around $73 million. In Singapore, Keppel Shipyard will fabricate, complete, and integrate the topsides modules and mooring support structure for one of the FPSOs. The unit features oil processing capacities of up to 180,000 barrels per-day and 424MMcf of gas treatment capacities per-day. 2. The deal is estimated at $4.6 billion would make the largest single FPSO order since 2013 when Samsung Heavy Industries was awarded with the 3.8-trillion-won ($3.4 billion) worth Egina FPSO deal. Check Pages 51 - 97 of CONFIGURED FOR GROWTH - Keppel Offshore & Marine in the flip PDF version. Keppel Offshore & Marine awarded US$2.3b contract to build FPSO for Petrobras Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). Keppel Offshore & Marine, through its subsidiaries, has inked new contracts froom Petrobras and SOFEC, worth in total about US$96.22 (S$130 million). Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). In Singapore, Keppel Shipyard has been awarded a contract to convert an LNG Carrier to a Floating Storage and Re-gasification Unit (FSRU). Other stocks mentioned: PBR.A Global operating fleet The field is located in block BC20A, for which BW Offshore became the concessionaire as of September '19. Petrobras previously signed a deal to build the FPSO P-78 with Keppel Shipyard on May 10. Petrobras has started the bidding process for the acquisition of a new FPSO for the Búzios field, in the Santos Basin pre-salt. Ltd., an EPCI arm of the MODEC, Inc. group (MODEC). Keppel O&M and Sembcorp Marine accounted for 70 per cent of floating production, storage and offloading vessel conversions as of 2011, according to data released by the government of Singapore, although global FPSO conversion volume has seen a decline in recent years on delayed tenders and final investment decisions by field operators. 1. Currently, Keppel Shipyard is carrying out four other FPSO and FSO conversion and upgrading projects at its yards. KEPPEL Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. Keppel and its subsidiary Keppel Shipyard and SembCorp Marine’s Jurong Shipyard are also among the leading companies that specialize in fast-track modification and fabrication work. The FPSO is moored at a depth of 2,600 m in Block 249 Walker Ridge in the US Gulf of Mexico and is rated for 80,000 bbl/d (13,000 m 3 /d). Dura plate 301 projects. Oilfield Technology , Monday, 10 May 2021 14:40. BW Offshore’s tanker BW Nisa was converted into the FPSO P-63. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petrobras, for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). FPSO OSX-1- It was Keppel Shipyard’s first project for OSX Brasil S.A. The Singaporean group beat South Korean shipyards in a bidding process for an FPSO in Brazil's Búzios field. Keppel Offshore & Marine: Awarded US$2.3 Billion Contract To Build FPSO For Petrobras. Keppel Offshore & Marine awarded US$2.3b contract to build FPSO for Petrobras. Brazilian oil and gas giant Petrobras has signed a $2.3 billion worth contract with Keppel Shipyard to build the P-78 FPSO, the seventh unit to be installed in the Búzios field, in the Santos Basin pre-salt area. Clifford Capital acted as Initial Bookrunning MLA in the US$720 million Senior Secured Term Loan financing for SBM’s Liza Destiny FPSO which would be deployed in Guyana under a long-term charter with ExxonMobil. Keppel Offshore & Marine Ltd (Keppel O&M) has delivered the P-57 Floating Production Storage and Offloading (FPSO) vessel to SBM Offshore N.V. (SBM) early, within budget and safely. Singapore, 10 May 2021 – Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). Company: McDermott Pte. In Brazil, Keppel O&M’s BrasFELS shipyard has a topsides module fabrication job for an FPSO for Petrobras’ Búzios field in … 1 Keppel Offshore & Marine is a global leader in offshore rig design, construction and repair, shiprepair and conversion, and specialised shipbuilding. Bnamericas Published: Tuesday, February 02, 2021. Keppel Offshore & Marine has through its wholly-owned subsidiaries in Singapore and Brazil secured two contracts from MODEC for FPSOs with a combined value of around $73 million. In Singapore, Keppel Shipyard has been engaged to fabricate, complete and integrate the topsides modules and mooring support structure for an FPSO. SINGAPORE (THE BUSINESS TIMES) – Keppel Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. Keppel AmFELS, a shipyard strategically located at the gateway of the Gulf of Mexico, Brownswille, Texas has secured a contract from Diamond Offshore to construct and upgrade a moored semisubmersible rig with delivery scheduled for 3Q 2013. Petrobras and Sete have reportedly reached agreement on the Seconded by Airenergi International Pte. Monday, February 22 2016 ... would be held at Keppel’s Singmarine Shipyard in Singapore, on April 14, 2016. Brazilian President Lula witnesses the naming of the country’s largest converted FPSO, in terms of production capacity, at the BrasFELS yard in Angra … The contract was awarded by Brazil’s national oil company, Petroleo Brasileiro SA (Petrobras) on the basis of an international tender for the delivery of P-78, a floating production storage … Project Manager for the Maromba field, offshore Brazil. Serves as main contractor team members during the mechanical completion and commissioning phase of GLASSDWR FPSO at. Petrobras (PBR) Finalizes RLAM Refinery Sale to Mubadala. The deal is estimated at $4.6 billion would make the largest single FPSO order since 2013 when Samsung Heavy Industries was awarded with the 3.8-trillion-won ($3.4 billion) worth Egina FPSO … Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). Tenders Deepwater industrial Engineering Conventionals. Keppel Shipyard's contract from SOFEC is for the fabrication of a turret mooring… Keppel delivers FPSO to MODEC in Brazil The unit is touted as the largest FPSO in the world. In Singapore, Keppel Shipyard has been awarded a contract to convert an LNG Carrier to a Floating Storage and Re-gasification Unit (FSRU). Job interview questions and sample answers list, tips, guide and advice. For the field, Keppel offered to build the FPSO platform, P-78, with an investment of R$12.52bn ($2.33bn), Reuters reported, citing three people close to the competition. Zacks. Download CONFIGURED FOR GROWTH - Keppel Offshore & Marine PDF for free. Ltd, Batam, Indonesia. At that time, Petrobras envisaged a 30,000 b/d system, but even the lowest bid proved too costly. Petrobras — headed by chief executive Maria das Gracas Foster — was initially considering tendering for a slightly smaller unit, capable of producing 120,000 bpd … Petrobras previously signed a deal to build the FPSO P-78 with Keppel Shipyard on May 10. Terminal Petrobras reportedly ready to settle with Sete Brasil. Work for a recent conversion was carried out at Cosco Shipyard in China for Petrobras. LCH Loh Chin Hua, CEO of Keppel Corporation CHC Chan Hon Chew, CFO of Keppel Corporation CT Christina Tan, CEO of Keppel Capital CO Chris Ong, CEO of Keppel Offshore & Marine LL Louis Lim, CEO of Keppel Land LNG to FSRU conversion. Keppel Shipyard says that, following last week’s naming ceremony, it is on track to complete the modification and upgrading works on FPSO OSX-1, the first FPSO … Keppel and Sembcorp Marine ink deal to explore creating stronger offshore & marine player 1000th UK offshore wind turbine for Ørsted Jan de Nul completes installation of … 2. The estimated shipyard contract price is approximately US$150 million. Keppel Shipyard leading Petrobras FPSO tender. Keppel Shipyard also secured a contract from Yinson Nepeta Production, a wholly-owned subsidiary of Yinson Production, for the fast-track modification and upgrading of FPSO Allan. Keppel Shipyard Ltd., Singapore Jan 2010 - Jun 2010 6 months • Lead multi-disciplinary teams of operation, engineering and commercial consist of domestic and foreign employees to execute and deliver ship-repair projects to different type of vessels, such as container liner, oil tanker, dredger, pipe laying barge, bulk carrier, LNG carrier. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel … Keppel Shipyard and Hyundai Heavy Industries will jointly build and deliver an FPSO to pump oil from Petrobras-operated Buzio oilfield. The last FPSO order worth over 1 trillion won a Korean shipbuilder brought home was a 1.1-trillion-won deal by Samsung Heavy Industries in 2019. 255,272-dwt tanker’s upgrading into P-57 was completed at Keppel Shipyard earlier, with shipyard receiving S$1mln bonus. SMM remains our top pick to ride O&G recovery with its strong visible order pipeline while Keppel is a safer bet backed by its multi-pronged business strategy. The yard’s work scope on the vessel was refurbishment, life extension and upgrading. ... Saudi Aramco. The FPSO will be deployed at the Sepia field, which is located in the pre-salt region in the Santos Basin, some 250 kilometers off the coast of Rio de Janeiro, Brazil. Friday, January 29, 2021 . Petroleo Brasileiro S.A. - Petrobras produce and sells oil and gas in Brazil and internationally. The FPSO operating in the deepest waters is the FPSO BW Pioneer, built and operated by BW Offshore on behalf of Petrobras Americas INC. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). The Keppel Shipyard-led consortium partners include Hyundai Heavy Industries Holding and Brazil-based BrasFELS shipyard. Petrobras 78 Unread post by escveritas » Wed Feb 24, 2021 1:32 pm RIO DE JANEIRO (REUTERS) - A consortia led by Singapore's Keppel Shipyard offered Brazil's Petrobras the lowest price to build a floating platform for Buzios, Latin America's second-largest oil field, three people close to the competition said. The FPSO conversion was undertaken at Keppel Shipyard with topside modules supplied by Dyna-Mac, a Singapore SME. Keppel will use its Brazilian shipyard BrasFELS on parts of the fabrication scope to fulfill the 25% local content requirement. Keppel Corporation 1Q 202. The vessel, which should be delivered in 2024 and pump first oil in 2025, will also have installed capacity to produce 180,000 b/d and process up to 7.2 million cu m/d. The pair won the $2.3bn floating production, storage and offloading vessel contract through an international tender held by Petrobras. 22 April 2021, 6.00pm . Its topside was built at Keppel Fields shipyard in Singapore, while its hull and mating operation were performed at the Brasfels shipyard in Rio de Janeiro. The vessel, which should be delivered in 2024 and pump first oil in 2025, will also have installed capacity to produce 180,000 b/d and process up to 7.2 million cu m/d. Petrobras said June 11 it had agreed a $2.3 billion deal with a joint venture formed by Italian oil field services company Saipem and South Korea's Daewoo Shipbuilding and Marine Engineering, or DSME, to build the FPSO P-79, which will have installed capacity to pump 180,000 b/d of oil and process 7.2 million cu m/d of gas. Lack of finance, skilled workforce hampering automation in Brazil . Petrobras previously signed a deal to build the FPSO P-78 with Keppel Shipyard on May 10. TYPE … Marine: Energean FPSO contract in the bag?). Keppel Offshore & Marine awarded US$2.3b contract to build FPSO for Petrobras Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO). is a leading engineering, procurement, construction and Phase 3 of the project will deploy as FPSO by the name of Marechal Duque de Caxias. It was transported to its final location in late 2013 and installed by April 2014. Tuesday, February 02, 2021 . SINGAPORE (May 10): Keppel Shipyard, the wholly-owned subsidiary under Keppel Offshore & Marine (Keppel O&M), has secured a contract worth US$2.3 billion (S$3.05 billion) from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a Floating Production, Storage and Offloading vessel (FPSO).The contract was won on the basis of an … CONFIGURED FOR GROWTH - Keppel Offshore & Marine was published by on 2015-10-20. Sembawang Shipyard Singapore. P-77 FPSO is operating on the Buzios field; Source: Petrobras SINGAPORE (THE BUSINESS TIMES) – Keppel Offshore & Marine (Keppel O&M), has through its wholly owned subsidiary Keppel Shipyard, secured a contract worth about US$2.3 billion. 1 www.fpsoworldcongress.com POST SHOW REPORT Pre-Conference Workshops: 28 September 2015 Main Conference Day: 29-30 September 2015 Post-Conference Workshops: 1 October 2015 Venue: MAX Atria @ Singapore EXPO, Singapore www.fpsoworldcongress.com. Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Brazil’s national oil company, Petroleo Brasileiro S.A (Petrobras), for the turnkey delivery of P-78, a floating production, storage and offloading vessel … Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has secured a contract, on the basis of an international tender, from Petrobras for the turnkey delivery of P-78, a FPSO vessel. 15.