Company data
From Opera Wiki
Revision as of 08:51, 24 May 2011 by Fabrizio.Loddo (Talk | contribs)
N.B: To access this window from Opera Job Management: open Options menu, then select Company data
this archive is used to manage Company data. This part is examined by the program during the various work order calculation phases. For example, when calculating labour costs, interests, etc...
Description of contents
- Currency : the default currency of the company, it's the same one used to set the prices within the archives.
- Second currency : the second currency. it will be used in the chart totals.
- Double Tax/Tax 1/Tax 2 if enabled, Opera iwll manage double taxes.
- Labour/Installation hourly rate: The hourly costs for labour and installation.
- % packing: The percentage that has to be added to the industrial cost relative to the packaging materials.
- % shipping.: The percentage that has to be added to the industrial cost relative to the shipping.
- % overhead: The percentage that has to be added to the industrial cost relative to the work order processing expenses (electricity, telephone, other expenses,…)
- % sales comm.: The percentage that has to be added to the industrial cost as a commission for the sales representative
- % admin.: The percentage that has to be added to the industrial cost relative to the time spent to process the work order
- % waste: The waste percentage calculated over one year. It usually is around 8-10%.
NOTE:
It is known that a lock manufacturing company usually has around 10% waste over one production year.
It is known that a lock manufacturing company usually has around 10% waste over one production year.
- % margin: The profit percentage to be charged to the client.