Job material data management
From Opera Wiki
Revision as of 08:45, 19 October 2023 by Monica.Sanna (Talk | contribs)
In the framework that allows the management of Job parts list, was added the possibility of freezing individual items, which are not considered in the final costs and bills of materials.
This allows to differentiate the final supply by customer and avoid duplicating typologies in the archive.
To do this, use the button File:Congelamateriali .png. In the section File:Sezionecommessa .png, moreover, above the button File:Datimateriali .png it is visible the amount of frozen items (see picture). The same button opens the Job data management panel, which contains the list of frozen items. In this panel it is possible to unfreeze previously selected items File:Gestionedatimateriali .png