Job material data management

From Opera Wiki

(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
[[File:quadromaterialicommessa_.png|600 px|thumb|right|The material management panel]]
[[File:quadromaterialicommessa_.png|600 px|thumb|right|The material management panel]]
-
{{NB|This panel can be reached by pressing the button [[Image:tastomateriali.png]] from the management framework of the job}}
+
{{NB|This panel can be reached by pressing the button [[Image:tastomateriali_.png]] from the management framework of the job}}
In the framework that allows the management of ''Job parts list'', was added the possibility of freezing individual items, which are not considered in the final costs and bills of materials.
In the framework that allows the management of ''Job parts list'', was added the possibility of freezing individual items, which are not considered in the final costs and bills of materials.

Revision as of 08:46, 19 October 2023

File:Quadromaterialicommessa .png
The material management panel
Note N.B: This panel can be reached by pressing the button File:Tastomateriali .png from the management framework of the job

In the framework that allows the management of Job parts list, was added the possibility of freezing individual items, which are not considered in the final costs and bills of materials.

This allows to differentiate the final supply by customer and avoid duplicating typologies in the archive.

To do this, use the button File:Congelamateriali .png. In the section File:Sezionecommessa .png, moreover, above the button File:Datimateriali .png it is visible the amount of frozen items (see picture). The same button opens the Job data management panel, which contains the list of frozen items. In this panel it is possible to unfreeze previously selected items File:Gestionedatimateriali .png

Personal tools